Drinko Library Second Floor Outage Tuesday 16th October 2018 08:15 AM


One switch in the cluster servicing the second floor of Drinko Library reloaded. Cause is still being investigated. During reload any devices connected to this switch would've been unable to access the internet. Due to this being the switch with the uplink all devices on second floor experienced an outage during reload.

Impact: Minor

Affected Applications: All wired devices connected to second floor switch cluster.